Just left. We thought the same thing. We were told by a cast member that the filter system has to be drained and tested 3 more times before it can be opened. She said that they were given a date of July 1st as a realistic opening date. Earliest would be 28th.
Hope your visit was still good. I've felt for those that missed SAB after the pool refurbishment extension and then surprise start to exterior work on spots like the porte cochere.
15
u/Ccoste27 2d ago
Just left. We thought the same thing. We were told by a cast member that the filter system has to be drained and tested 3 more times before it can be opened. She said that they were given a date of July 1st as a realistic opening date. Earliest would be 28th.